Bolt to Production

90% of Bolt.new Deployments Fail on First Deploy

Bolt.new runs in a WebContainer that auto-injects env vars, CORS, and Supabase credentials. None of that exists on Vercel or Netlify. We fix the gap in 2-4 weeks.

The "Preview Works, Production Fails" Problem

Bolt.new is the fastest path to a working demo — "Zero to Live URL" in under 10 minutes. But the WebContainer runtime is fundamentally different from production infrastructure.

Afterbuild Labs data shows ~90% of first production deploys require at least one round of env var, CORS, or credential fixing. Your app works perfectly in Bolt — then blank screen on Vercel.

5 Gaps in Every Bolt.new App

Works in Preview, Broken in Production

Bolt runs in StackBlitz WebContainer with auto-injected env vars and permissive CORS. 90% of first deployments fail on real infrastructure.

Environment Variable Mismatch

Env vars auto-inject in preview but don't exist on Vercel/Netlify. API keys, Supabase credentials, and Stripe keys are missing on deploy.

No Local Development

Cloud-only with no local run option. Can't attach debuggers, profile memory, or test production load before deploying.

Context Loss at Scale

AI loses track after 20-25 files. Creates duplicate components, forgets patterns, token drift on spacing and colors.

No CI/CD Pipeline

No Docker, no build scripts, no automated testing. Every deployment is manual and error-prone.

How We Close the Gap

1

Environment Audit & Fix

Identify all missing env vars, move secrets to server-side, configure for production deployment targets.

2

CORS & Routing Fix

Configure proper CORS policies, fix hardcoded localhost URLs, set up routing for production server.

3

Security Hardening

Add authentication, protect API routes, remove hardcoded credentials, implement proper authorization.

4

Performance Optimization

Add database indexes, implement caching, optimize queries for production scale.

5

CI/CD Setup

Configure Docker, set up automated testing, build staging/production pipelines.

Ready to Deploy to Production?

Get a free audit of your Bolt.new app. We'll identify the gaps and give you a clear roadmap to production in 2-4 weeks.

Get Your Free Audit
2-4 Weeks
Average time to production
90%
deployments fixed
5 Steps
Production checklist